It is estimated that 215,000 people crossed the Causeway from Johor to Singapore last year, of which 60% did it on foot.
“This is at a proposal stage. With the walkway, we can solve this safety issue,” he told reporters after visiting the proposed site for the walkway at the Sultan Iskandar Customs, Immigration and Quarantine (CIQ) Complex.
The walkway is to be built on the existing motorcycle lanes on both sides of the Causeway.
“We’ve found many bus passengers are encroaching on the routes used by vehicles to beat traffic before continuing their journey by public transport when they reach the other (Singapore) side,” he adds.
According to Mohd Solihan, the project is expected to cost about RM15 million ($4.9 million) and consultants are currently preparing a detailed proposal for the state government to study, which should be ready in about two to three weeks.