The Zhuertun Project includes the retrofitting and expansion works of Zhuertun Waste Water Treatment Plant, which currently has a designed daily waste water treatment capacity of 5,000 cubic metres.
Everbright Water will provide operation and management services to the Zhuertun Waste Water Treatment Plant once the retrofitting and expansion works are completed. The work will be developed on a BOT (Build-Operate-Transfer) model, with a concession period of 30 years. The expansion work will contribute an additional daily waste water treatment capacity of 5,000 cubic metres.
Everbright Water's shares closed 1.5 cents higher, or 6.7% up, at 24 cents.