Floating Button
Home News Company in the news

Tiong Seng signs MOU to develop precast production capabilities and supply components to real estate projects in Ghana

Nicole Lim
Nicole Lim • 1 min read
Tiong Seng signs MOU to develop precast production capabilities and supply components to real estate projects in Ghana
The anchor project will see the partners collaborating on a pilot tertiary student hostel development at the University of Ghana, in Accra. / Photo: Tiong Seng
Font Resizer
Share to Whatsapp
Share to Facebook
Share to LinkedIn
Scroll to top
Follow us on Facebook and join our Telegram channel for the latest updates.

Tiong Seng Holdings’ wholly-owned subsidiary has signed a memorandum of understanding (MOU) with Rock Africa to develop precast production capabilities for the supply of precast components to housing and institutional projects in Ghana.

The anchor project will see the partners collaborating on a pilot tertiary student hostel development at the University of Ghana, in Accra, comprising four residential blocks with approximately 2,280 rooms providing accommodation for up to 10,000 beds.

Tiong Seng’s subsidiary, Robin Village Development (RVD) will provide design engineering, shop drawings, yard planning, support and structured training on the prefabricated construction technologies to build a skilled local workforce for factory production and on-site installation.

Shares in Tiong Seng closed flat at 9.5 cents on Aug 28.

×
The Edge Singapore
Download The Edge Singapore App
Google playApple store play
Keep updated
Follow our social media
© 2025 The Edge Publishing Pte Ltd. All rights reserved.